Hoodsport Hills (Official Title)

Post date: Feb 19, 2015 1:04:12 AM

The Port has signed off on the preliminary design of the new course. Still a long ways from final but they are happy with the scale and scope. The port will be looking into the new parking lot and bathroom facilities. MCDG is scheduling a walk through to elevate the design to "build level", build level design is not set in stone but close enough we can begin committing resources.